Production task
Cleaning had to protect the hygienic result while reducing time, chemical consumption and interruptions to production.
Voigtländer · Flagship case study
Anolyte generation within a CIP process
90 → 20 minCleaning sequence
CIP equipment.
At a glance
Source: Voigtländer case study.
The application
The case describes a soft-drink production line where on-site Anolyte generation was integrated into the CIP cleaning process.
3D illustration created with AI Cleaning had to protect the hygienic result while reducing time, chemical consumption and interruptions to production.
Anolyte generated on site was dosed into the CIP process. The sequence changed from 5 → 3 cleaning steps.
The case study reports payback usually under 36 months. All values belong to this production application and are not a forecast for another plant.
The process
Inlet and water meter, brine tank, the three-chamber generator, anolyte tank, demand-led dosing, measurement and control. Press “Show me the process” to start the animated 3D diagram.

Modelled from the Voigtländer plant schematic of an anolyte system, in the drawing language of the home page. The cards show documented facts only, no invented figures.
Scope of the results
An installation, evaluated within its own operating context.
From reference to your project
This project shows one application. Explore the treatment approach and the decisions that matter before adapting it to your site.
Technical enquiry
Send the operating context and Hydreatio will route the enquiry to the right technical discussion.
Describe your water task and constraints so the right specialist can respond.
Start enquiry ›CIP for soft drinks90 → 20 min · Cleaning sequence
Discuss your projectHydreatio assistant AI
AI assistant. It can make mistakes, and its answers are not a diagnosis of your plant. For anything further, please use our contact page. Privacy